Red Eléctrica has published the call for the Active Demand Response Service (SRAD) for the first half of 2027: qualification requests will be accepted until 16 November 2026 and the auction will take place on 26 November. For companies with flexible consumption, the immediate step is to define how much capacity they can commit, what impact it will have on their operations and under what economic conditions. [1]

The SRAD is a voluntary, paid mechanism of the Spanish mainland electricity system. It allows consumers to provide flexibility by committing to reduce their demand when Red Eléctrica requests it, in exchange for payment for availability and for the activations carried out. [4]

Key dates and conditions of the SRAD for the first half of 2027

Red Eléctrica has published a requirement of 2,405 MW for the period from 1 January to 30 June 2027. These are the main details of the call: [1]

Item Call for the first half of 2027
Service delivery period 1 January to 30 June 2027
Capacity required by the system 2,405 MW
Availability 2,586 hourly periods over the half-year
Qualification requests accepted Until 16 November 2026
End of the qualification process 19 November 2026
Bid submission From 00:00 on 25 November to 11:00 on 26 November 2026
Auction date 26 November 2026
Expected final results Before 14:00 on 26 November 2026
Expected activations Around 25 orders and up to 50 estimated hourly periods (non-binding forecast)

The key date for submitting the request is 16 November. 19 November marks the end of the qualification process. It is advisable to prepare the technical data and documentation well in advance so they can be reviewed. [1]

Service hours

The call sets the following periods, using its hourly notation: [1]

  • Monday to Friday: H1 and H8 to H24.
  • Saturdays, Sundays and public holidays: H19 to H24.

The schedule must be read together with the public holidays and the clock-change provisions set out in the annex to the call. The 2,586 hours define the service availability window; actual consumption reduction only takes place when an activation is ordered. [1]

How the SRAD works for a company

Taking part means committing a reduction capacity during the set periods. If the system operator activates the service, the company must deliver the response and sustain it for the required time.

  • Notice: at least 12.5 minutes before the activation starts.
  • Duration: up to two hours per activation.
  • Maximum frequency: one activation per day per provider.

These parameters must fit the processes and shifts of the facility. Availability and response are verified through metering; non-compliance can affect payment and lead to penalties or, in the cases provided for, disqualification. [2, 4]

Which companies can take part in the SRAD

Demand facilities connected to the Spanish mainland electricity system that meet the qualification and operating requirements can take part. The providing programming unit must demonstrate at least 1 MW of bid capacity, which can be reached by aggregating several facilities. Real-time communications and metering through a qualified control centre are also required. [2]

Contracted power alone does not determine how much capacity a company can provide. Red Eléctrica’s guide links the practical bid limit to the minimum expected consumption during the service period. The analysis should therefore start from the load curve and the activity planned for the half-year. [5]

How the SRAD is paid and how much a company can earn

Payment has two components: availability of the awarded capacity, at the marginal price resulting from the auction, and activated energy, linked to tertiary regulation. The availability price for the first half of 2027 will be set at the auction on 26 November 2026. [1, 3, 4]

The SRAD results for the first half of 2026 are a historical reference. The price and economic conditions of that call should not be extrapolated to the new half-year.

As an initial approximation, gross availability revenue is estimated by multiplying the awarded capacity in MW by the paid hours and by the award price in €/MWh. This estimate must then be adjusted for settlement conditions and actual compliance.

To make a decision, the company needs to estimate the net benefit: potential revenue, the cost of adapting operations, the economic terms of the participation contract and the possible effects of non-compliance. It should also consider how its activity would respond under different activation scenarios.

The forecast of around 25 orders for the half-year is non-binding. It can guide the analysis, but it is not a guaranteed maximum number of activations and cannot, on its own, support a profitability forecast. [1]

What a company should analyse before taking part

The reduction capacity it can sustain

The load curve should be cross-checked against shifts, maintenance shutdowns, seasonality and planned production changes. This makes it possible to identify which demand can be reduced and during which periods, avoiding committing capacity based solely on consumption peaks.

How activity is recovered also matters. A one-off reduction may require reorganising tasks, extending a later shift or managing a restart. The analysis should capture these effects in order to value flexibility with a complete view of operations.

Operating costs and contract terms

It is worth quantifying the cost of stopping and restarting, the possible effects on quality and production, and the resources needed to respond. With this information, a minimum payment that justifies the commitment can be defined.

The participation contract should clearly set out how revenue is shared, any applicable fees or commissions, liability for non-compliance and how settlement works. In aggregated participation, it is important to understand how obligations are shared and how the behaviour of each facility can affect the whole.

How it fits with the energy procurement strategy

Participation in the SRAD should be assessed alongside the electricity supply, the consumption profile and the company’s financial objectives. Flexibility revenue and savings on energy procurement are separate concepts that need to be integrated into the overall assessment.

The decision may be to take part with a conservative capacity, to adapt certain processes beforehand, or to conclude that the conditions do not pay off. The criterion should reflect the ability to comply and the expected benefit for the business.

The Energy Tools perspective

At Energy Tools, we see competitive procurement as part of an energy strategy grounded in a sound understanding of consumption and contract terms. Our independence from energy retailers gives us the judgement to assess the SRAD according to each company’s interests.

This approach makes it possible to weigh potential revenue against operational reality and reach a concrete decision: whether to take part, with how much capacity and under what conditions. The aim is for flexibility to boost competitiveness through a commitment the company can actually meet.

Frequently asked questions about the SRAD 2027

Can a company take part with less than 1 MW of capacity?
Access is possible through aggregation, as long as the programming unit reaches the minimum of 1 MW of bid capacity and the applicable requirements are met. Feasibility must be checked for each facility. [2]

Is the SRAD price for the first half of 2027 already known?
As of 28 October 2026, the availability price is pending the auction on 26 November. Payments from previous calls can serve as a historical reference, but they do not set the price for the new half-year. [1, 3]

Does consumption have to be reduced during all 2,586 hours?
The 2,586 hours are the availability periods. Consumption reduction is only required when Red Eléctrica activates the service, in line with the applicable response conditions. [1, 2]

Are the 25 expected activations a maximum limit?
The call refers to around 25 orders, with up to 50 estimated hourly periods. It is a non-binding forecast and should not be read as a guaranteed limit. [1]

Is the SRAD compatible with self-consumption or batteries?
If present, the facility’s configuration and metering must be reviewed. The regulations require any associated generation or storage to be identified and its prior schedule to be maintained during activations. The capacity offered must be assessed in line with these conditions. [2]

What is the deadline for submitting qualification requests?
Requests received up to 16 November 2026 will be accepted. The qualification process ends on 19 November; these are two separate milestones. [1]

Decide before committing capacity

The call for the first half of 2027 is an opportunity to assess the value of your company’s flexibility. Before the request deadline closes, it is worth defining the capacity it can provide, the impact of responding and the economic conditions that would justify taking part.

Want to know whether the SRAD is right for your company?
Get in touch with our consulting team to assess whether the SRAD fits your company’s operations and energy strategy.


Sources

[1] Red Eléctrica. Publication of information on the active demand response service. October 2026, pages 3 and 4. Call for the first half of 2027.

[2] BOE (Spanish Official State Gazette). Resolution of 6 November 2025. Operating Procedure 7.5: SRAD requirements, activation and compliance (in Spanish).

[3] BOE. Resolution of 11 May 2026. Amendment to the award mechanism of Operating Procedure 7.5 (in Spanish).

[4] Red Eléctrica. SRAD information published on 28 May 2026. Reference for the general operation of the service (in Spanish).

[5] Red Eléctrica. Guide to participating in the SRAD S2 2026, section 3.1. Reference for the analysis of minimum expected consumption (in Spanish).